The 1st building in Germany with an MRE-hybrid was inaugurated in October 2016.
The building complex has 13 floors and was built in the late 60s.
The goal of this MRE-hybrid installation, formerly called "WindRail", was to both test and pilot a real case building with this highly innovative technology.
Anerdgy delivered 10 MRE-hybrid modules with a total peak power of 12kW solar and 10kW wind.